
New TopShim run:

version = topshim 2.1.0
date = 2021-12-06
time = 00:19:37.558
command = topshim 

FINE SHIMMING

Parameters:

probe = Z75811_0017
solvent = H2O+D2O_salt
shim nucleus = 1H
nucleus optimised for = 1H
o1p (from lock) = 4.70 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before= 0.8 Hz, Target= 0.2 Hz, After= 0.9 Hz
Iteration 2: FWHM Before= 0.9 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration 3: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration 4: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration 5: FWHM Before= 0.3 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration 6: FWHM Before= 0.3 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration 7: FWHM Before= 0.3 Hz, Target= 0.3 Hz, After= 0.3 Hz
Slow convergence detected. Shimming was aborted.
Using the best result as the final shim state.

Lineshape quality factor (1D spectrum, non-spinning) = 0.551

shim changes: 
Z	-37
Z2	+20
Z3	+101
Z4	-1101
Z5	-157
Z6	+6350
Z7	+2204
Z8	-21155

duration = 51 sec
completed successfully
finished Mon Dec  6 00:20:27 2021


========================================================================
